EarthworkSTC / FIELD

Bank / loose / compacted

Move between in-situ bank yards, fluffed loose yards, and as-placed compacted yards using factors you control — calibrate with geotech, field counts, and moisture.

Volume factors
Loose CY (from bank + swell)
1,250

When set, downstream compaction uses this loose volume instead of the calculated value.

Multiply loose volume by this factor to approximate compacted volume placed (project-specific — use lift counts and tests on site).

Approx. compacted CY
1,150

These free calculators are for informal support and education only. S Thomas Construction is not responsible for errors, omissions, misuse, or any decisions, damages, losses, or unsafe practices based on them. By using any calculator on this site, you agree to the Terms of Use below.